Infrastructure corridor
We are building road, rail, and walking–cycling routes to Boden Industrial Park to ensure safe access and enable freight to move by rail.
Updated:
Quick summary of each heading on the page
Please note that all forms, digital applications (e-services) and some linked websites are currently in Swedish. Contact Citizen Service if you need help in English.
What we are building
Purpose and scope
The road, railway, and walking–cycling path make it safer to reach the area and allow goods to be transported in and out by train.
Consideration for neighbours and the environment
Works are planned to respect the environment and people living nearby.
About the project
The municipality has procured Polar Structure as majority owner of Boden Järnväg AB and to deliver the infrastructure. The contract is carried out with Peab during 2024–2025.
Impact across the municipality
This is one of several major projects in Boden. Increased heavy traffic may affect travel times.
Ongoing works and traffic impacts
Works during summer and autumn 2026
- Additional work is being carried out along the noise barrier by Road 97.
- Paving work in the area is planned to begin during week 24. Traffic will be affected periodically, and temporary signage will be put in place. Once paving along Lulevägen is completed, the recycling station will be moved back to its regular location.
- Work on the pedestrian and cycle path towards Stegra continues according to plan. Paving is scheduled for August.
- The road and the pedestrian and cycle path are expected to be completed and reopened to traffic on 1 October.
- The railway inauguration will take place on 9 June. Work will then continue towards Flarken and Road 605. That section is expected to be completed in autumn 2027.
- During the summer, the number of transports to and from the area will increase.
Have a great summer!
As summer approaches, we would like to extend our sincere thanks to all nearby residents for your patience and understanding over the past few years.
At times, the project has caused disruptions in the surrounding area, and we are very grateful for the positive cooperation and constructive dialogue that have characterised the work so far.
Please do not hesitate to contact us if you have any questions or comments. We value your feedback and continuously work to find the best possible solutions for everyone affected.
We would like to remind everyone that all areas marked in red are still active work zones. For safety reasons, it is important that all barriers and restricted areas are respected by everyone.
Working hours and safety
Working hours
From week 19, works run every day 07:00–19:00. In week 20, Nåiden plans night-time railway works.
Respect the work zone
Please follow barriers and signs. Unauthorised presence in the work area increases the risk of accidents. Be especially careful near operating machinery.
For nearby residents: transport and dust
Transport of rock material has been reduced, which lowers dust. Measures include regular watering, salting and sweeping of roads during construction.